LAND MANAGEMENT DIVISION / PUBLIC WORKS DEPARTMENT / 3050 N. DELTA HWY / EUGENE, OR 97408
DIVISION FAX 541/682-3947 / BUILDING (541) 682-4651 / PLANNING (541) 682-3577 / COMPLIANCE (541) 682-3724 / ON-SITE SEWAGE (541) 682-3754
LANE COUNTY
BUILDING & ELECTRICAL
PROGRAMS
PERMIT FEE GUIDE
A listing of fees associated with Building, Plumbing,
Mechanical and Electrical Permits issued by Lane
County Land Management Division
Effective April 1, 2015
- 1 -
Building Permit Fees
Building Valuation (LM60.855(14))
Actual total construction costs or, at a minimum, project value
based on square footage costs as dictated by current ICC
valuation table
Reference Page 2 for Building Valuation Data
January/February 2014 ICC Building Valuation
Table
Structural Permit Fee (LM 60.855(1))
Based on State of Oregon Structural Permit Fee Table
Reference Page 2 for Structural Permit Fee Table
Structural Plan Review Fee (LM 60.855(2)) ..………………...
65% of Structural Permit Fee
Fire/Life Plan Review Fee (LM 60.855(2))
Fee applied when FLS review required by ORS 479.155 as
authorized by OAR 918-460-0040 ………………………………
40% of Structural Permit Fee
Manufactured Dwelling and Park Model Permit Fees
Placement Permit Fee (LM 60.855(2))
Includes Plan Review, Electrical & Plumbing Connections …..
$439.80
Mobile Home and Recreation Parks
Manufactured Dwelling Parks (LM 60.855(5))
Valuation …………………………………………………………...
Fees ………………………………………………………………...
Per Table 2 of OAR 918-600
130% of the fees in OAR 918-600
Recreation Parks (LM 60.855(6))
Valuation ………………………………………………………...…
Fees ………………………………………………………………...
Per Table 2 of OAR 918-650
130% of the fees in OAR 918-650
Other Building Permit Fees
Building Demolition Permit Fee (LM 60.855(2))
(Per structure) ….………………………………………………….
$95.50
Swimming Pool Permit Fee (LM 60.855(2))
(Plumbing and/or Mechanical Extra) ……...…………………….
$110.20
Solar Water Heating and Photovoltaic Electric Generators
(LM 60.855(9))
Applicable building, plumbing and electrical permit fees
assessed in accordance with the appropriate sections of
LM60.855.
LM60.855
Code Interpretation Conference Fee (LM 60.855(2))
Minimum fee ………………………………………………..
Cost per hour ……………………………………….………
$62.00
$62.00
Temporary Certificate of Occupancy
(LM 60.855(10)) ……………………………………………
10% of Building Permit Fee
Phased Projects (LM 60.855(13))
Plan review fee for each phase of a phased project is $95.00 plus 10 percent of the total project building permit fee
not to exceed $1,500 for each phase.
Deferred Plan Submittals (LM 60.855(13))
Fee for processing and reviewing deferred plan submittals is 65 percent of the building permit fee calculated from the
Permit Fee Table of page 2 of this guide using the value of the particular deferred portion or portions of the project
with a set minimum fee of $95.00.
- 2 -
Building Valuation Data
From the January/February 2014 ICC Building Valuation Table
Square Foot Construction Costs
a, b, c, d
Group
Type of Construction
IA
IB
IIA
IIB
IIIA
IIIB
IV
VA
VB
Assembly, theaters, with stage
229.03
221.51
216.10
207.06
194.68
189.07
200.10
177.95
171.21
Assembly, theaters, without stage
209.87
202.35
196.94
187.9
175.62
170.01
180.94
158.89
152.15
Assembly, nightclubs
177.89
172.85
168.07
161.49
151.98
147.78
155.80
137.68
132.99
Assembly, restaurants, bars,
banquet halls
176.89
171.85
166.07
160.49
149.98
146.78
154.80
135.68
131.99
Assembly, churches
211.95
204.43
199.02
189.98
177.95
172.34
183.02
161.22
154.48
Assembly, general, community halls,
libraries, museums
176.88
169.36
162.95
154.91
141.73
137.12
147.95
125.00
119.26
Assembly, arenas
208.87
201.35
194.94
186.90
173.62
169.01
179.94
156.89
151.15
Business
182.89
176.17
170.32
161.88
147.55
142.00
155.49
129.49
123.76
Educational
195.85
189.10
183.56
175.25
163.21
154.58
169.21
142.63
137.99
Factory and industrial, moderate
hazard
108.98
103.99
97.83
94.17
84.37
80.56
90.16
69.50
65.44
Factory and industrial, low hazard
107.98
102.99
97.83
93.17
84.37
79.56
89.16
69.50
64.44
High Hazard, explosives
102.01
97.02
91.86
87.20
78.60
73.79
83.19
63.73
NP
High Hazard
102.01
97.02
91.86
87.20
78.60
73.79
83.19
63.73
58.67
HPM
182.89
176.17
170.32
161.88
147.55
142.00
155.49
129.49
123.76
Institutional, supervised environment
180.72
174.14
169.28
161.12
149.06
145.04
161.12
133.69
129.43
Institutional, hospitals
308.50
301.79
295.93
287.50
272.14
NP
281.10
254.09
NP
Institutional, nursing homes
213.56
206.85
200.99
192.56
179.22
NP
186.16
161.17
NP
Institutional, restrained
208.37
201.66
195.80
187.37
174.54
167.98
180.97
156.48
148.74
Institutional, day care facilities
180.72
174.14
169.28
161.12
149.06
145.04
161.12
133.69
129.43
Mercantile
132.61
127.57
121.79
116.21
106.35
103.15
110.52
92.05
88.36
Residential, hotels
182.28
175.70
170.83
162.68
150.87
146.84
162.68
135.49
131.23
Residential, multiple family
152.86
146.27
141.41
133.25
122.04
118.01
133.25
106.66
102.41
Residential, one- and two-family
143.93
139.97
136.51
132.83
127.95
124.61
130.57
119.73
112.65
Residential, care-assisted living
facilities
180.72
174.14
169.28
161.12
149.06
145.04
161.12
133.69
129.43
Storage, moderate hazard
101.01
96.02
89.86
86.20
76.60
72.79
82.19
61.73
57.67
Storage, low hazard
100.01
95.02
89.86
85.20
76.60
71.79
81.19
61.73
56.67
Utility, miscellaneous
77.10
72.64
68.12
64.64
58.13
54.28
61.62
45.49
43.33
a. Private Garages use Utility, miscellaneous d. N.P. = not permitted
b. Unfinished basements (all use groups) = $15.00 per sq. ft. * Carport, covered porch, patio, or deck use 50%
c. For shell only buildings deduct 20 percent of Private Garages
Brief Explanation of Construction Types: All buildings are classified according to their construction type. Type I is least combustible
and Type V is most combustible. The difference in A or B for a given construction type is the level of fire resistance construction
rating (A is “protected” and B is “unprotected”). Below is a description of each construction type.
Type I (IA or IB): Constructed of noncombustible materials (typically concrete frame buildings)
Type II (IIA or IIB): Constructed of noncombustible materials (typically masonry bearing walls with steel framing)
Type III (IIIA or IIIB): Exterior walls are of noncombustible materials and the interior building elements are of any material permitted
by code (combustible or non-combustible)
Type IV: Heavy timber (HT) construction
Type V (VA or VB): Constructed of any materials allowed by code. Most residential construction in Lane County is Type VB
Permit Fee Table
TOTAL VALUATION FEE
$1.00 to $500.00 $22.45
$501.00 to $2,000.00 $22.45 for the first $500.00, plus $4.30 for each additional $100.00 or fraction thereof, to and including $2,000.00.
$2,001.00 to $25,000.00
$86.95 for the first $2,000, plus $10.20 for each additional $1,000.00 or fraction thereof, to and including $25,000.
$25,001.00 to $50,000.00 $321.55 for the first $25,000, plus $7.40 for each additional $1,000 or fraction thereof, to and including $50,000.
$50,001.00 to $100,000.00
$506.55 for the first $50,000, plus $4.20 for each additional $1,000 or fraction thereof, to and including $100,000.
$100,001.00 and up $716.55 for the first $100,000, plus $3.90 for each additional $1,000 or fraction thereof.
- 3 -
Electrical Permit Fees (LM 60.855(8))
Residential (per unit, service included)
1,000 sq. ft. or less …………………………….….....
Each add’l 500 sq. ft. or portion thereof …….……..
Limited/restricted energy (wiring for doorbells,
garage door opener and heating and air
conditioning wiring covered by base fee for
square footage above) ….………………….…...
Each manufactured home service or feeder ….…..
$143.00
$26.00
$41.00
$90.00
Services or Feeders
(installation, alterations, relocation)
200 amps/5 kva or less ………………………...…...
201 to 400 amps/5.01 to 15 kva …………...….……
401 to 600 amps/15.01 kva to 25 kva..….……...
601 amps to 1,000 amps ……...………………….…
Over 1,000 amps or volts..…………………….…
Reconnect only ………...…………………………….
$100.00
$126.00
$175.00
$276.00
$556.00
$82.00
Temporary Services or Feeders (installation,
alteration, relocation)
200 amps or less …………………………….………
201 amps to 400 amps …………………….………..
401 amps to 600 amps ………………….…………..
Over 600 amps or 1,000 volts ……………….……..
$82.00
$99.00
$162.00
See Services or Feeders section above
Branch Circuits
(new, alteration, extension per panel)
With purchase of service or feeder fee:
Each branch circuit ………………………….…..
Without purchase of service or feeder fee:
First branch circuit …………………………..…..
Each additional branch circuit …………….…
$7.00
$76.00
$7.00
Miscellaneous
(service or feeder not included)
Each pump or irrigation circle ………………….…...
Each sign or outline lighting ……………………...
Signal circuit(s) or a limited/restricted energy
panel, alteration or extension ……………….....
Each additional inspection ……………………...…..
Plan check fee (when required and as
allowed by OAR 918-311-0055) ………............
$82.00
$82.00
$82.00
$76.00
25% of electrical permit fee
Electrical Master Permit Program
Enrollment Fee ……………………………………….
Inspection Time ………………………………………
$100.00
$86.00/hr
- 4 -
Mechanical Permit Fees (LM 60.855(4))
Minimum Mechanical Permit Fee……………………………………...……………………..... $47.50
Residential Mechanical Permit Fee Items
1. Installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents
attached to such appliance, up to and including 100,000 Btu/h (29.3kW)
$46.00
2. Installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents
attached to such appliance over 100,000 Btu/h (29.3kW)
$50.65
3. Installation or relocation of each floor furnace, including vent
$46.00
4. Installation or relocation of each suspended heater, recessed wall heater or floor-mounted unit heater
$46.00
5. Installation, relocation or replacement of each appliance vent installed and not included in an appliance
permit.
$35.50
6. Repair of, alteration of, or addition to each heating appliance, refrigerator unit, cooling unit, absorption
unit or each heating, cooling, absorption, or evaporative cooling system, including installation of controls
regulated by the code.
$46.00
7. Installation or relocation of each compressor to and including three horsepower (10.6 kW), or each
absorption system to and including 100,000 Btu/h (29.3 kW)
$46.00
8. Installation or relocation of each compressor over three horsepower (10.6 kW) to and including 15
horsepower (52.7 kW), or each absorption system over 100,000 Btu/h (29.3 kW) to and including 500,000
Btu/h (146.6 kW)
$63.50
9. Installation or relocation of each compressor over 15 horsepower (52.7 kW) to and including 30
horsepower (105.5 kW), or each absorption system over 500,000 Btu/h (146.6 kW) to and including
1,000,000 Btu/h (293.1 kW)
$77.50
10. Installation or relocation of each compressor over 30 horsepower (105.5 kW) to and including 50
horsepower (176 kW), or each absorption system over 1,000,000 Btu/h (293.1 kW) to and including
1,750,000 Btu/h (512.9 kW)
$103.10
11. Installation or relocation of each refrigeration compressor over 50 horsepower (176 kW), or each
absorption system over 1,750,000 Btu/h (512.9 kW)
$155.60
12. Each air handling unit to and including 10,000 cubic feet per minute (4720 L/s), including ducts attached
thereto. (Note, this fee shall not apply to an air-handling unit which is a portion of a factory-assembled
appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in
the code)
$40.20
13. Each air-handling unit exceeding 10,000 cfm (4720 L/s)
$50.65
14. Each evaporative cooler other than portable type
$40.20
15. Each ventilation fan connected to a single duct
$35.50
16. Each ventilation system which is not a portion of any heating or air-conditioning system authorized by a
permit
$40.20
17. Installation of each hood which is served by a mechanical exhaust, including the ducts for such hood
$40.20
18. Installation or relocation of each domestic-type incinerator
$50.65
19. Installation or relocation of each commercial or industrial-type incinerator
$129.95
20. Installation or relocation of each residential heat pump
$61.15
21. Installation or relocation of each wood/pellet/gas stove or insert
$91.60
22. Fuel gas piping:
Each gas-piping system of one to four outlets
Each additional outlet above four, per outlet
$16.95
$4.75
23. Each appliance or piece of equipment regulated by the code, but not classed in other appliance categories
or for which no other fee is listed in this code.
$40.75
Commercial/Industrial
Mechanical permit fee calculated based on the value of the mechanical equipment and installation costs
applied to the building permit fee table (see page 2 of this guide). Minimum mechanical fee applies.
Mechanical Plan Review
Mechanical plan review fee (when required) as a percentage of total mechanical fees ............... 25%
- 5 -
Plumbing Permit Fees (LM 60.855(7))
Minimum Plumbing Permit Fee ……………………………………………………………..
$47.50
One and Two Family Dwellings
(Includes: DWV/water distribution and the first 100 feet of water service, sanitary
sewer and storm sewer.)
Single Family: 1 Bath …………………...…………………………………………….….
Single Family: 2 Bath ………………………………………………………………..……
Single Family: 3 Bath ..……………………...…………………………………………....
Each additional bath over three or kitchen over one …………………………………..
Accessory, Addition, or Alteration
Based on Number of Fixtures ...……………………………………………………………….
Other water service or building sewer fee determined in accordance with water
service/sanitary/storm sewer subsection below.
$294.35
$389.35
$474.75
$95.75
$17.10/fixture
Residential Fire Suppression System
Fee calculated as separate flat fee based on square footage of structure
0 to 2000 square feet …………………………………………………………………………..
2001 to 3600 square feet ………………………………………………………………………
3601 to 7200 square feet ………………………………………………………………………
7201 square feet and greater ………………………………………………………………….
Manufactured Dwelling or Park Model
Manufactured Dwelling Park Sewer Collection and Water Distribution System (per
space) ……………………………………………………………………………………….
Manufactured Dwelling or Park Model Service Connection (sewer, water and storm)
First 30 feet included in placement fee
If first 30 feet purchased separate from placement fee ………………………………..
Each additional 100 feet or fraction thereof in accordance with water
service/sanitary/storm sewer subsection below.
$87.00
$129.00
$164.00
$200.00
$57.00
$57.00
Commercial/Industrial
Based on Number of Fixtures ………………………………………………………………....
Other water service or building sewer fee determined in accordance with water
service/sanitary/storm sewer subsection below.
$17.10/fixture
Water Service/Sanitary/Storm Sewer
Water Service (first 100 feet or fraction thereof) ……………………………………………
Water Service (each additional 100 feet or fraction thereof) ……………………...………
Building Sewer (first 100 feet or fraction thereof) ………………..…………………………
Building Sewer (each additional 100 feet or fraction thereof) …….………………………
Building Storm Sewer or Rain Drain (first 100 feet or fraction thereof) ………………..…
Storm or Rain Drain (each additional 100 feet or fraction thereof) …….…………………
Alternate Potable Water Handling Systems (coil, extractor, heat pumps, etc.) …………
$57.00
$47.50
$57.00
$47.50
$57.00
$47.50
$57.00
Plumbing Plan Review Fee
Plumbing plan review fee (when required) as a percentage of total plumbing fees ……
30%
* For the purposes of calculating the permit fees above, “fixtures” includes but are not limited to the
following: Bathtubs, bidets, clothes washers, drinking fountains, laundry tubs, showers, sinks, urinals,
water closets, water heaters.
- 6 -
Additional Fees and Surcharges
The following fees and surcharges, while not levied by the Building or Electrical Programs, are applied to
building and electrical permits and incorporated into the total permit fee to be collected at the time of
permit issuance. As these can constitute a significant portion of your permit fees, a brief summary is
included here in the Building & Electrical Program Fee schedule for your reference.
Surcharges and Fees Typically Applied to Building and Electrical Permits
State Surcharge (LM 60.855(12) and ORS 455.210, 220)
Calculated as a percentage of building permit fees or hourly fees in lieu of permit
and is forwarded to the State of Oregon Building Codes Division…………………..
12%
Land Management Division Administrative Fee (LM60.850(8))
Calculated as a percentage of total permit fees, supports the activities of the LMD
Administration Program. …………….……………………………..……………………
15%
Long Range Planning Surcharge (LM60.850(9))
Calculated as a percentage of total permit fees, supports
the activities of the
Long Range Planning Program within LMD.…………………………………….....
13%
Land Management Division Technology Assessment (LM 60.855(6))
Calculated as a percentage of total permit fees with an applicable maximum
amount, r
evenue collected is utilized to implement technology improvements
throughout the Division ……………………………………………..……………………
2% w/ $100
max
Construction Excise Tax
Applies to construction within certain school districts in Lane County. The
Construction Excise
Tax is assessed as a dollar rate per square foot of
residential and/or non-residential construction which is collected by LMD and
forwarded to the school district assessing the tax for capital improvement project
funding.
Rates vary among districts, contact LMD Administration or specific
school district for more information.
Fee Collection
At the time a permit application for simple mechanical, plumbing or electrical scopes of work are taken in
the total fee for the permit can be calculated based on the items listed on the application. This fee is
collected in full at the time of application. However, the total fee for more complex permit applications
(commercial structures, dwellings, accessory structures, etc.) that require land use, sanitation and other
approvals can not necessarily be calculated at the time of application. For this reason, a permit intake fee
is collected at the time of application in lieu of full fees. The permit intake fee is the sum of fees associated
with foreseeable services that will be rendered in processing the permit prior to issuance. This includes
fees associated with applicable plan check, addressing, planning review and approval, sanitation review
and approval, as well as local surcharges on these amounts. Once the application is approved and all fees
are known, the balance of the total fees will be owed. The balance will include fees for any review that was
completed but not included in the intake fee, fees associated with inspection services to be rendered once
the permit is issued, and applicable local and state surcharges.
Since the intake fee varies with each permit and is not known until your application is reviewed, please be
prepared to pay the calculated amount at the time of application. You may reference the calculation sheet
at the end of this guide to help you estimate the fees included in the permit intake fee and get a general
assessment of the amount that will be owed at time you submit your application.
DIVISION FAX 541/682-3947 / BUILDING (541) 682-4651 / PLANNING (541) 682-3577 / COMPLIANCE (541) 682-3724 / ON-SITE SEWAGE (541) 682-3754
LANE COUNTY PUBLIC WORKS
Estimating Your Building Permit Fees
LAND MANAGEMENT DIVISION 3050 N. DELTA HWY, EUGENE OR 97408
1. Approximate Construction Cost of your Project
Use the higher of the quoted cost (provided by applicant) or calculated cost (using information below):
Current Costs per Square Foot for Typical Projects in Lane County (Wood Construction):
Standard Dwelling/Residential Addition = 110.29/sq. ft. Carport, covered porch, patio or deck = $21.24/ sq. ft.
Garage, Shop, Shed = 42.48/sq. ft. Alterations and remodels = Quoted Cost from Applicant
Current Cost Per Sq. Ft. using Table on Page 2 of Permit Fee Guide:
Each Area’s Current Cost per sq. ft. based on Use and Construction Type x Area (Sq. ft.) = Valuation Subtotal
Area 1: Use: _____ & Const. Type: ______ Cost Per Sq. Ft. ________ x Square Feet __________ = Valuation Subtotal ________________
Area 2: Use: _____ & Const. Type: ______ Cost Per Sq. Ft. ________ x Square Feet __________ = Valuation Subtotal ________________
TOTAL PROJECT VALUATION = $___________
2. Structural Permit Fee based on the Total Project Valuation
TOTAL VALUATION FEE
$1.00 to $500.00 $22.45
$501.00 to $2,000.00 $22.45 for the first $500.00, plus $4.30 for each additional $100.00 or fraction thereof, to and including $2,000.00.
$2,001.00 to $25,000.00
$86.95 for the first $2,000, plus $10.20 for each additional $1,000.00 or fraction thereof, to and including $25,000.
$25,001.00 to $50,000.00 $321.55 for the first $25,000, plus $7.40 for each additional $1,000 or fraction thereof, to and including $50,000.
$50,001.00 to $100,000.00
$506.55 for the first $50,000, plus $4.20 for each additional $1,000 or fraction thereof, to and including $100,000.
$100,001.00 and up $716.55 for the first $100,000, plus $3.90 for each additional $1,000 or fraction thereof.
Structural Permit Fee $ ___________ PLUS
3. Electrical Fees: (reference Page 3 of the Permit Fee Guide) Electrical Fee $ ___________ PLUS
4. Mechanical Fees: (reference Page 4 of the Permit Fee Guide) Mechanical Fee $ ___________ PLUS
5. Plumbing Fee: (reference Page 5 of the Permit Fee Guide) Plumbing Fee $ ___________ PLUS
6. Building Fee Subtotal: (sum of items from 2 through 5 above) $
7. Plan Review Fee: 65% x Structural Permit Fee (Item 2) Plan Review Fee $ ___________ PLUS
8. Sanitation Fees: (contact Sanitation Program for more info) Septic Fee $ ___________ PLUS
9. Planning Fees: (contact Planning Program for more info) Planning Fee $ ___________ PLUS
10. Address Fee: Add $190 only if this is a new residence Address Fee $ ___________ PLUS
11. Permit Fee Subtotal: (sum Items 6 through 11) $
12. State Building Codes Surcharge: (12% of item 6 above) State Surcharge $ ___________ PLUS
13. County Surcharges: Apply each to Permit Fee Subtotal (item 11).
Reference Page 5 of the Permit Fee Guide for more details:
LMD Administrative (15%)
Long Range Planning (13%)
New Technology (2%, $100 max)
14. Approximate Building Permit Fee:
Surcharges from items 12 and 13 added to the Permit Fee Subtotal (11) $
County Surcharge Total $ PLUS